
To Coil Delivery
Process Optimization
Coil Genealogy
Steel operations are capital intensive and margin thin. Yield losses, energy spikes, and rework eat profits.
SteelX provides a steel specific accelerator—ready domain model, curated data products, analytics, and workflows—so you can optimize from scrap yard to coil delivery on the Optimon Platform.
Energy Reduction
Yield Improvement
ntegrated platform with real-time optimization, genealogy tracking, and predictive analytics from meltshop to finishing.
SteelX empowers every stakeholder in the steel manufacturing ecosystem
Stabilize heats, reduce energy and electrode usage
Prevent breakouts, improve flatness/thickness, reduce surface defects
Genealogy, disposition rules, right first time improvements
Predictive maintenance, energy & utility optimization
SteelX connects the entire steel value chain from meltshop to shipping, providing unified visibility where furnace operations inform caster decisions, mill data drives quality improvements, and maintenance insights optimize the entire production flow.
Comprehensive suite of steel-specific tools and analytics for manufacturing excellence
Yield % kWh/ton Electrode kg/ton Tap to tap time Rework rate Surface defects PPM
Real-time monitoring with automated alerting and trend analysis across all critical steel manufacturing metrics
Seamless connectivity with your existing steel manufacturing ecosystem:
Built for industrial security and operational requirements:
Structured 90-day deployment plan with clear milestones and deliverables for steel operations
Our proven methodology for steel operations ensures you see energy and yield improvements within 30 days, with full genealogy and optimization capabilities deployed in 90 days.
Days to Energy Savings
Days to Predictive Analytics
Days to Full Optimization
Measurable improvements across key steel manufacturing metrics
(baseline dependent)
Energy Intensity
Reduced kWh/ton through optimized charge mix and heat cycles
Yield Improvement
Higher material utilization with predictive quality control
Breakout Reduction
Fewer caster interruptions through predictive risk scoring
Surface Defects
Reduced rework and regrade through mill optimization
6-12 Months
Typical payback period through energy savings, yield improvements, and reduced rework
Common questions about SteelX implementation and capabilities
